Past Senior Design Projects
Students pursuing undergraduate degrees are required to complete 2 semester-long industry projects. These projects give the students the opportunity to be industry consultants and to apply the skills/Competencies learned during their undergrad studies to real world production problems.
Project Title
Semester
Company
Team
Set-up Time Reduction through Lean Manufacturing Techniques
S-05
Love Box Company
Jason Rouse (MfgE), Choon Ling Tay (IE), Abdullah Abdulwahab (IE)
Design of an Ergonomic Checklist and a Workstation
S-05
Case New Holland
Matthew Kamerick (IE), Bandar Hamda (IE) and Behnaz Nouri (IE)
Capacity Utilization of the Autoclave Department
S-05
Cessna Aircraft Company
Dustin McCowan (MfgE), Gary D Souza (IE)
Improving the Vane Pump Assembly Process
S-04
Great Plains Industries
A. Alhajri, K. Iem, G. Nye
Process Improvements in the Paint Shop
S-04
Air Capitol Plating
S. Corcoran, T. Huynh, A. Mageto
Analysis of Kit-Fill and Line-Stock Systems
S-04
Cessna
T. Mai, J. Hamilton, K. Zens
Development of Scheduling Tools for Paint Hanger Production
S-04
Cessna
L. Bernstorf, J. Lauer, Ridwan
Plant II Factory Re-arrangement Project
S-04
Boeing
M. El-Ghazoui, A. Herr, K. Neises
Improving the MRB Process
F-03
Cessna
C. Yip, K. Neises, S. Kupper, T. Huynh
Software Development for Process Documentation
F-03
Case New Holland
T. Mai, B. Gatundu, L. Bernstorf
Development of Sheet Metal Manufacturing Cell
F-03
Thayer Aerospace
S. Corcoran, M. Farris
Improvements of the Shipping and Receiving Process Flow
S-03
Thayer Aerospace
K. Iem, K. Smith, E. Wilmeth
Process Analysis and Improvement
S-03
Air Capitol Plating
M. Farris, A. Nguyen, T. Pheng
Building Utilization and Facilities Improvement
S-03
WSU Southside Education Center
L. Pearson, M. Goh
Capacity Analysis of E-commerce Order Distribution
S-03
Coleman
A. Anderson, B. Gatundu, C. Yip
Conceptual Design of a High-Strength Blind Fastener and Installation Device.
F-02
Boeing
A. Anderson, D. Koehn, R. Mason, S. Spencer
Disposal of Microfoil Waste
F-02
Pioneer Balloons
S. Chai, F. Lim, T. Foo, K. Nguyen
Manufacturing Cabinetry to Design Specifications
F-02
Wend-Wood, Inc.
A. McLaren, E. Wilmeth, M. Goh
Improvement for the Receiving Process
F-02
Cessna
Q. Clark, A. Murdock, K. Smith
Coleman Production Line Optimization
F-02
Coleman
A. Nguyen, J. Brummer
Inventory Management
F-02
Wend-Wood, Inc.
S. Ong, A. Pheng, G. Youse
Ergonomic Evaluation and Improvement of Wire Shop
S-02
Learjet
S. Chai, C. Greene, K. Nguyen
Design of Tool Crib Management System
S-02
Cessna
Q. Clark, C. Ekrut, S. Ong
Design and Manufacturability Analysis
S-02
Boeing
J. Brummer, J. Denayer, R. Joshua, H. Serna
Design of an Assembly Cell
S-02
Thayer Aerospace
A. Murdock, B. Rajjoub, G. Youse
Department Consolidation and Plant Layout Improvement
S-02
Plastic Fab.
S. Spencer, T. Wie, A. McLaren
Reduction of Setup Time for CNC Machines
F-01
Tweco Robotics
K. Allred, B. Rajjoud, H. Serna
Evaluation of Radio Frequency Identification Technology by Process Mapping
F-01
Boeing
C. Ekrut, C. Greene, L. Io
Improvement of the Stockroom Operations through Lean lift Implementation
S-01
Cessna Aircraft
M. Al-Mardini, L. Io, I Jithavech
Improvement of the Material Handling System
S-01
Tweco,
L Sir-Sain, D. Bigler, C. Lim
Design of Hydroform Pallet System
S-01
Raytheon Aircraft
P. Hughes, C. Kennedy, V. Sambasivan
Streamlining Production Flow of Boeing 737 Cargo Shrouds
S-01
Plastic Fab
K. Allred, T. Aytekin, B. Lee
Tool Management Analysis for Tool Crib
S-01
Tru Circle
S. Jewell, A. Sanchez, M. Staley
Design of Cycle Counting Process
F-00
Thayer Aerospace
B Lee, M Bernbeck, I Handoko, B. Hesslink
Facility/Process Design for TrackMaster,
F-00
FullVision
I Jithavech, V Tennekoon, WTneh
Lot Size Analysis in the Light Structures Department,
F-00
Boeing
S Leong, A El-Bahraoui, M Staley, R. Chong
Design of Seat Assembly Line
F-00
Cessna
D. Bigler, C. Merten, S. Jewell
Testing System Assessment and Design for Hawker 800XP
F-00
Raytheon
A. Sanchez-Marsa, J. Sutherland, S. Chuah, C. Chian
Automation of Spice Packaging
F-00
Dean and DeLuca
C. Kennedy, M. Al-Mardini, D. Housholder
A Case Study of Aerospace Systems & Components, Inc.
S-00
Aerospace Systems and Components Inc
V. Polcyn, S. Tan, V. Tennekoon
Hand Forming Process Improvement
S-00
D-J Engineering Inc.
J. Ahmed, R. Chong, D. Housholder
Assessment of Shipping Container Alternatives
S-00
Boeing
C. Chew, S. Chuah, B. Hesslink, C. Merten
Community Toolbox Design
S-00
Cessna
T. Ching, W. Gina
Bond Shop Investigation
S-00
Cessna
B. Kraus, A. Bahraoui, M. Bernbeck
Process Integration in a Flow Line
S-00
Philips Lighting
I. Handoko, C. Ma, J. Sutherland
Integration of Jig Shops
F-99
Cessna
F. Yang, C. Ma, V. Polcyn
Improvement of Material Handling
F-99
Metal-Fab
M.Casados, C. Chew, B. Kraus
Quality Improvement of the Hairpin and Expanding Process
F-99
York International
M. Pendleton, J. Ahmed, S. Tan
Reduction of Material Handling by Way of Forklifts
F-99
Metal-Fab
M. Casados, C. Chew, B. Kraus
Scrap Reduction and Productivity Increase in Solenoid Production
F-99
Aerospace Systems and Components, Inc.
T. Aytekin, J. Smith
Statistical Process Control: York International
F-99
York International
M. Pendleton, J. Ahmed, S. Tan
Design of A Robotic Weld Line
S-99
Case Corporation
J. McClanahan, M. Casados
Material Removal Rate Improvements for Titanium
S-99
L and S Machining
J. Smith, J. Wagner
Analysis and Improvement of the Uniloader Leak Test Area
S-99
Case Corporation
L. Kuan, Ng, A. Al-Rubia, F. Lim
Set up Reduction at the CNC machining centers
S-99
Advanced Manufacturing Technologies INC.
M. Abdelaal, V. Sambasivan, F. Hsieh
Via Christi Regional Medical Center-St. Francis Campus
S-99
Via Christi
M. Pendleton, F. Yang, S. Tan
Setup Reduction at the CNC Machining Centers
S-99
Advanced Manufacturing Technologies Inc.
M. Abdelaal, V. Sambasivan, F. Hsieh
Design and Analysis of the Admissions Department at St. Francis Campus
S-99
Via Christi
M. Pendleton, F. Yang, S. Tan
Layout Design for Aircraft Seat Frames Manufacturing Plant
F-98
Cessna Aircraft
S. Wong, P. Tioanda, E.Unaja
Analysis of Improvement for the Cessna 208 Upholstery shop
F-98
Cessna Aircraft
J. McClannahan, J. Wagner, C. Yew
Layout for Tooling Building of Cessna Facility at Pawnee
F-98
Cessna Aircraft
F. Hsieh, S. Tan, K. Soebandrija
Carousel Standardization
F-98
Chance Industries
L. Sivanesan, M. Abdelaal, A. Al-Rubia
Layout Design fro Aircraft Seat Frames Manufacturing Plant
S-98
Cessna
S. Wong, P. Tioanda, E. Unaja
Analysis of Improvement for Transportation Department
S-98
Via Christi
L. Tamariz, W. Hor, C. Yew
A New Continuous Flow Process for Manufacturing Carrousel horses
S-98
Chance Rides, Inc.
M. Barkley, H. Leong, D. Mikesell
Design of A Tool Box
S-98
Cessna Aircraft
S. Chan, K. Soebandrija, L. Sivanesan, R. Novello
Capacity Planning and Staffing Level of An Automated Machining Cell
S-98
Raytheon Aircraft
W. Wong, P. Ong, S. Wong, Y. Lee
Final Assembly Line Design for RT-52 Buses and Coach
F-97
Chance Coach Inc.
J. Jafri, M. Barkley, S. Wong
New Tooling Facility Design
F-97
Raytheon
H. Leong, S. Ganapathi, M. Ooi
Evaluation of Plant Layout for Stretch Press Tooling for Skin Production
F-97
Boeing
T. Smith, S. Chan, E. Unaja
Design Facility Layout for New Seat Assembly Plan
F-97
Cessna Aircraft
K. Hallacy, W. Hor, Y. Lee
Warehouse Safety Plan
F-97
Love Box Inc.
P. Tioanda, W. Wong, K. Yong
Magazine Manufacturing Line Design
F-97
Center Industries
L. Tamariz, S. Wong, T. Jong
Bottleneck Analysis of 750 Line
S-97
Cessna
H. Lee, A. Tantra, K. Yong
Performance and Service Attributes
S-97
Evcon Industries, Inc
J. Jafri, W. Phan, K. Hallacy
Model 60 Process Flow Improvement
S-97
Learjet Corporation
B. Clevenger, G. Sellaperumall, B. Yii
Ergonomic and Safety Evaluation
S-97
Cessna
P. Ng, T. Smith, Y. Liu
Bottleneck Analysis of the Change Order Process
S-97
Unitary Product
B. Farris, T. Jong, M. Ooi
Analysis of Change Order Process
S-97
Evcon Industries, Inc
B. Farris, T. Jong, M. Ooi
Analysis of Delay Time of the Hunter 20 Machine
F-96
Grede Foundries, Inc.
J. Bonner, K. Devlin, H. Lee
Project Proposal for Process Analysis
F-96
Mid-Central Machine
P. Ng, C. Yii, T. Unruh
Ergonomic Assessment, Analysis, and Recommendations for the Engineering Services At
F-96
Evcon Industries, Inc.
J. Casal, K. Liu, T. Koo
Analysis Model of the Learjet M45 Final Line
F-96
Learjet
A. Tantra, J. Arevalo, S. Goh
Field Test Locations
F-96
Evcon Industries
B. Clevenger, P. Pong, J. Thamrin
Minimizing Labor Costs Without Reducing Labor Force
F-96
Via Christi Regional Medical Center
B. Farris, C. Noland, Y. Liu
Redesigning the Housemate Assembly Line at Center
S-96
Center Industries
M. Khalidi, W. Lai, C. Noland
Patient Flow at a Comprehensive Occupational Medical Programs Clinic
S-96
Occupational Medical Clinic
C. Dao, C. Tay, J. Arevalo
Redesign of an Axle Manufacturing Workstation at CASE Corporation
S-96
J.I. Case Corp
K. Devlin, T. Koo, A. Sukri
A Bottleneck/ Capacity Analysis at Coleman Company
S-96
Coleman
J. Bonner, J. Casal, W. Tamimi, J. Themrin
Scheduling Analysis for an Automotive Decal Industry
S-96
Avery Dennison
D. Akbari, M. Nouri, T. Unruh
Banding Machine Capacity Analysis
F-95
Love Box Co.
A Scheduling System for the Box plant
F-95
Love Box Co.
Bottleneck Analysis of Inspection, Cleaning, and Packaging
F-95
Avery-Dennison
Crews in Motion
F-95
Cessna
Caraballo. Lai, Nouri, Perera
Capacity Analysis of Hydroforming Machines
S-95
Cessna Aircraft
K. Chen, F. Relf, A. Santoso
Expert System Development for cost Estimating
S-95